Step 1: Gather the Requirements
Before a Public Works Construction (Utilities) Permit can be issued, you will need to provide:
- Contact details for the applicant, contractor and/or developer, entered on the contact information spreadsheet
- The project address and its legal description
- The materials testing lab and the type of work involved, such as a meter, a meter vault, or water or wastewater lines
- The cost of the public improvements
- A trench safety plan prepared for this specific site
- A completed Maintenance Bond form
- A completed Construction Document Package
Step 2: Apply Online
Applications for this permit are submitted through the city's online permitting portal. If this is your first time using the portal, you will need a working email address to register. Setting up an account takes roughly five minutes.
Step 3: What Happens Next
Once your online application is complete, expect processing to take about three to five business days. If the application needs corrections or more information from you, approval may take longer.
Help by Phone or in Person
If you would like help with your online application, give the Engineering Department a call or stop by the office.
- Office: Engineering Department, City Hall, 100 Civic Center Drive, Fredville, TX 75999
- Email: [email protected]
- Phone: (555) 010-2124
- Hours: Monday through Friday, 8 a.m. to 5 p.m.
Fees
- Both the application and the payment are handled through the online permitting portal.
At a glance
- Fee
- 4% of the public water and sewer cost
- Who needs it
- A developer building water or sewer lines the city will own
- How to apply
- Apply and pay in the online permit portal.
- Application
- Sample application for this permit
- Turnaround
- 3 to 5 business days
- Questions
- (555) 010-2124, [email protected]