Transportation and Mobility Services manages street, signal and corridor projects throughout Fredville. Below is the latest on work that is underway or about to begin.
Fawnridge Parkway
Limits: Kestrel Line Road to the tollway
Builds a new four-lane divided concrete parkway with two bridges, plus sidewalks, storm drainage and new traffic signals.
Estimated completion: early fall 2025
Tamsworth Road at Bramblewood Creek
Paving, drainage, water and wastewater improvements on West Tamsworth Road where it crosses Bramblewood Creek.
The road will be raised at the creek, and the undersized box culverts will give way to a 150-foot bridge sized to safely carry a 100-year flood. Crews will remove the old culvert crossing, pavement and sidewalk; move water and wastewater mains; upgrade storm drains; build embankments and retaining walls; construct the bridge; and finish with new paving and sidewalks.
Estimated completion: June 2026
Traffic Signal: Yucca Bluff-Ashby-Morrow Road at Marlowe Parkway
Installs new traffic signals along with sidewalks, ADA curb ramps and fresh pavement markings.
Estimated completion: January 2026
Traffic Signal: Bluebonnet Road at Valor Lane
Adds a new signal with fiber optic communications, plus sidewalks, ADA ramps, pavement markings and the pavement for an added left-turn lane.
Point of Entry Wastewater Line for the Regional River Authority
Location: Ambermill Road, north of Kenwick Road
Moves a wastewater line ahead of a separate Texas Department of Transportation (TxDOT) project to rebuild the Ambermill Road bridge over Quillback Creek, which is expected to start in spring 2026. Drivers on Ambermill Road may see delays while the line is relocated.
Estimated completion: September 2025
Dynamic Message Signs and Traffic Cameras
Corridors: the interstate from the tollway to Ashcombe Boulevard, and the east-west state highway from NW 23rd St to Redbud Drive
Furnishes and installs closed-circuit television (CCTV) cameras and dynamic message signs (DMS) on both corridors. The cameras let staff watch traffic flow and crashes in real time and adjust signal timing as needed, while the signs warn drivers about incidents ahead and point them to detours.
Estimated start: July 2025
Avenue K Right-Turn Lane
Location: E. Avenue K at the western state highway
Adds a dedicated westbound right-turn lane on Avenue K at the highway, together with drainage changes, signal modifications and utility relocations.
Estimated start: October 2025. Estimated completion: February 2026
Calloway Street: Tollway to Tumbleweed Trace
Limits: the tollway to Tumbleweed Trace, including the intersection of Calloway Street and Wrenfield Parkway
Replaces the existing asphalt street with concrete pavement and adds new sidewalks, traffic signals, storm drains and streetlights.
Estimated start: fall 2025. Estimated completion: late 2026
Main Street and East Calloway Street Roundabout
Builds a roundabout where E. Main Street meets Calloway Street. The new layout will keep the intersection moving more smoothly and shift westbound trucks off Main Street and onto Calloway Street.
Estimated start: late 2025. Estimated completion: early 2027
Quarter-Cent Sales Tax Street Program
Fredville voters approved a quarter-cent increase in the local sales tax to fix existing streets and alleys across the city. The revenue goes into the Street Maintenance Sales Tax fund, which pays to repair and rebuild city streets and alleys.
2025 Street Maintenance Projects
| Street | Status | Limits |
|---|---|---|
| Heron Creek Dr | Finished | Tamberly Road to S Wrenfield Pkwy |
| Oak St | Scheduled for summer 2025 | Kestrel Line Rd to NE 15th St |
| Cormorant Cir | Finished | Castlemere Dr to Pendragon Blvd |
| Thistlewood Park Subdivision | Scheduled for summer 2025 | S Kestrel Line Rd to Almendra St |
| 108th St | Finished | Avenue J to the city limits |
| Clarion Trl | Scheduled for summer 2025 | Plover Trl to Aldergrove Trl |
| Martin Luther King | Finished | Tarlow Street to Texas St |
| Pennant Road | Scheduled for summer 2025 | Tamarind Road to Lakecrest Parkway |
| NW 9th St | Finished | Turnbridge Blvd to Blackthorn St |
| Hollins Subdivision | Scheduled for summer 2025 | East of S Wrenfield Pkwy, south of the interstate |
| Maple St | Finished | NE 19th St to Cottonwood St |
| Fernbrook Ln | Finished | Pinewhistle Dr to W Wexford Blvd |
Several alley and neighborhood segments are also part of the 2025 program. Call the city at (555) 010-0311 for the complete list.