A commercial shell building is a structure built with open, unfinished space before any tenant has been identified. Shell buildings are most often used for retail, offices or a mix of light to heavy industrial uses. No matter its size, every commercial shell building needs a permit approved by the Building Inspections Division.
Plans for non-residential work are reviewed against the 2021 International Building, Plumbing, Fuel Gas, Mechanical, Energy Conservation and Residential Codes and the 2023 National Electrical Code. A complete checklist for non-residential construction and addition permits is available from the division.
Step 1. Review Requirements
To receive a commercial shell building permit, you will need to submit:
- The project address and legal description
- Contact details for the owner, contractor and/or architect
- The planned use, overall square footage and area of work
- Class of work, a description of electrical, plumbing and mechanical scope, the project valuation and the market value of the property
- Architectural, structural, electrical, plumbing and mechanical drawings
- Foundation plans
- A floor plan identifying each room, its intended use, its square footage and all exits
- Wall sections and elevations
- A roof framing plan
- Sealed and signed engineering for structural, electrical, plumbing and mechanical plans when the building exceeds 5,000 square feet; structural plans for any metal building must be sealed regardless of size
- A scaled site plan showing:
- Property lines
- Existing easements
- The location and intended use of the new building
- Building dimensions
- Planned drainage
- Parking spaces, the drive approach and maneuvering area dimensions
- The proposed parking lot
- An engineer's signed and sealed letter
- Note: Extra installation requirements apply to unlisted equipment; contact the division for details.
Step 2. Apply Online
Building permit applications are submitted through the City of Fredville's online permit portal. First-time users register with a working email address, which takes about five minutes.
What Happens Next
Expect processing to take roughly 5 to 10 business days after you apply. If the applicant needs to make corrections or send more information, approval may take longer.
Phone / In Person
Our staff are happy to help with your online application by phone or in person.
Email us at [email protected]
Call: (555) 010-2235
Office: Building Inspections Division, City Hall, 100 Civic Center Drive, Fredville, TX 75999
Hours: Monday through Friday, 8 a.m. to 5 p.m.
Fees
- Applications and payments are both handled in the online permit portal.
- Use the portal's fee estimator to see what a commercial shell building permit will cost.
At a glance
- Fee
- $0.45 per $100 of project value, $500 minimum
- Who needs it
- The property owner or general contractor for a commercial site, before work starts
- How to apply
- Apply and pay in the online permit portal.
- Application
- Sample application for this permit
- Turnaround
- 5 to 10 business days
- Questions
- (555) 010-2235, [email protected]
Fredville is a demonstration city built by Talk to Fred. Names, numbers and details on this page are sample content.