A Public Works Construction Paving Permit is needed before work begins on public paving such as sidewalks, street bores, street cuts or new street paving.

Step 1. Gather What You Need

Have these items ready before the permit can be issued:

  • Contact information for the applicant, contractor and developer (spreadsheet form)
  • The project address
  • The materials testing lab you will use and the type of work planned (for example, new street paving, a street cut, a bore under the street or a sidewalk)
  • The cost of the public improvement
  • A paving bond
  • A completed maintenance bond form
  • A completed construction document package

Step 2. Apply Online

Submit your application through the city's online permitting portal. New users set up an account with a working email address, which takes about five minutes.

Step 3. Processing

Most complete applications are processed within three to five business days. Approval can take longer if staff need corrections or more information from you.

Help by Phone or In Person

Engineering staff can walk you through the online application by phone or at City Hall.

  • Phone: (555) 010-2124
  • Email: [email protected]
  • Office: Engineering Department, City Hall, 100 Civic Center Drive, Fredville, TX 75999
  • Hours: Monday through Friday, 8 a.m. to 5 p.m.

Fees

  • Fees are paid through the online permitting portal when you submit the application.

At a glance

Fee
4% of the public paving cost
Who needs it
A developer building streets, sidewalks or drainage the city will own
How to apply
Apply and pay in the online permit portal.
Application
Sample application for this permit
Turnaround
3 to 5 business days