Franchise Utility Notification

The Engineering Division sets the standards for, and issues permits to, franchised utility providers such as electric, telephone, gas and cable television companies that place facilities in city right-of-way or easements. Engineering staff confirm that these facilities are placed correctly inside the right-of-way, and that the disturbed area is restored to an acceptable condition once the work is done.

Step 1. Review the Requirements

Any work that closes a traffic lane needs a Traffic Control Plan released by the city, and that plan must be turned in along with your notification. The Franchise Utility Permit Form (PDF) lists the full requirements.

Step 2. Apply

Complete the Franchise Utility Permit Form (PDF) and email it to [email protected] or drop it off at the Engineering Department. For questions, call (555) 010-7557.

  • Office: Engineering Department, City Hall, 100 Civic Center Drive, Fredville, TX 75999
  • Hours: Monday through Friday, 7 a.m. to 4 p.m.

Step 3. What Happens Next

Permits are usually processed within 3 to 5 business days after the application arrives. If the applicant needs to provide corrections or more details, approval may take longer.

Fees

Franchise utility permits are issued at no charge.

At a glance

Fee
No fee
Who needs it
A franchise utility company working in the right-of-way
How to apply
Apply and pay in the online permit portal.
Application
Sample application for this permit
Turnaround
3 to 5 business days
Questions
(555) 010-7557, [email protected]

Fredville is a demonstration city built by Talk to Fred. Names, numbers and details on this page are sample content.