Demolition Permits for Commercial Property
No one may tear down a structure, or any portion of one, or start demolition work until the Building Inspections Division has issued a demolition permit.
Non-residential work in Fredville must meet these codes: the 2021 editions of the International Building, Plumbing, Fuel Gas, Mechanical, Energy Conservation and Residential Codes, and the 2023 National Electrical Code. The complete requirements are listed with the permit for non-residential additions and new construction.
Step 1: Gather What You Need
Submit these items before a demolition permit can be issued:
- An asbestos abatement survey (PDF)
- The project address and legal description
- Contact information for the owner and any contractor or architect
- The planned use, square footage and area affected
- The class of work, a description of electrical, plumbing and mechanical work, the project valuation and the property's market value
- A site plan or floor plan marking where the work will take place
- A completed commercial demolition questionnaire (PDF)
Step 2: Apply Online
Apply through Fredville's online permitting portal. First-time users need a valid email address to open an account; setup takes about five minutes.
After You Apply
Review usually takes 5 to 10 business days. Requests for corrections or more information from the applicant can stretch that timeline.
Help by Phone or in Person
If you would like help with the online application, call or stop by.
- Call the division at (555) 010-2235
- Write to [email protected]
- Visit the Building Inspections Division at City Hall, 100 Civic Center Drive, Fredville, TX 75999
- Office hours run 8 a.m. to 5 p.m., Monday through Friday
Fees
- Applications and payments are both handled in the online portal.
- Ask the division for a fee estimate for your demolition permit.
At a glance
- Fee
- $250
- Who needs it
- The property owner or general contractor for a commercial site, before work starts
- How to apply
- Apply and pay in the online permit portal.
- Application
- Sample application for this permit
- Turnaround
- 5 to 10 business days
- Questions
- (555) 010-2235, [email protected]
Fredville is a demonstration city built by Talk to Fred. Names, numbers and details on this page are sample content.