Building a retaining wall on a commercial property takes a permit approved by the Building Inspections Division, whatever type of wall it is.
Non-residential construction has to meet the codes Fredville has adopted: the 2021 editions of the International Building, Plumbing, Fuel Gas, Mechanical, Energy Conservation and Residential Codes, and the 2023 National Electrical Code. The division's non-residential construction information has more detail.
Step 1. Check the Requirements
The division needs the following before it can issue a commercial retaining wall permit:
- The street address and legal description of the property
- Contact information for the owner and any contractor or architect
- How the site will be used, plus the square footage and area involved
- The class of work, a description, the project valuation and the market value of the property
- A site plan that shows the property lines, any existing easements and where the new wall will go
- Wall specifications, such as its height and the materials to be used
Step 2. Apply Online
Submit your application through Fredville's online permit portal. First-time users create an account with a working email address, which takes roughly five minutes.
Step 3. After You Apply
Most applications are processed in 5 to 10 business days. The review may take longer if the division is waiting on corrections or extra information from the applicant.
Help by Phone or in Person
Staff can walk you through the online application over the phone or at the counter.
- Location: Building Inspections Division, City Hall, 100 Civic Center Drive, Fredville, TX 75999
- Email: [email protected]
- Phone: (555) 010-2235
- Hours: Monday through Friday, 8 a.m. to 5 p.m.
Fees
- The application and the fee payment are both handled in the online portal.
- Use the building permit fees page to estimate the cost of a commercial retaining wall permit.
At a glance
- Fee
- $200
- Who needs it
- The property owner or general contractor for a commercial site, before work starts
- How to apply
- Apply and pay in the online permit portal.
- Application
- Sample application for this permit
- Turnaround
- 5 to 10 business days
- Questions
- (555) 010-2235, [email protected]
Fredville is a demonstration city built by Talk to Fred. Names, numbers and details on this page are sample content.